Our house has been transformed lately with people moving and shaking all over the place. Darcey has moved into her new room, Tiarni will be moving into Darcey's old room after Craig has painted it (She won't be moving until we get back from Adelaide, I have been putting everything off 'until we get back' such as toilet training - although I have been doing that for a few months haha).
When Darcey moved we realised that we needed to do something about the 3 double melamine cupboards full of stuff that used to be in our study (her new room). There wasn't anywhere in our house that we really wanted to build some big cupboards so we were having some trouble coming up with a solution. And we found one! We have a ridiciously huge room (c'mon it is only for sleeping, who needs that much room?), so we decided to build some in there...
Before, this was when Craig was preparing the walls to paint them plain white for the inside of the cupboard
Craig fixing some cracks while everything was pulled apart, he hates how much the houses move in Perth. He can often be found looking at walls and inspecting them...
Voila! We are still in the process of moving everything into them, hopefully we will have our front room back again soon!
1 comment:
He made those?? Wow. I didn't realise he was handy...
=)
Post a Comment